Now That's Funny...

Sleepless Saving Time
Twice a year, we change the clocks for daylight-savings time. And twice a year, my normally punctual assistant arrives late to work the Monday after we do so. I finally had to find out why. “Do you have a problem remembering to spring forward or fall back?” I asked. “Oh, no,” she said, pouring herself a cup of coffee. “What gets to me is staying up until 2 a.m. to change my clock.”

Strong Man on the Job
The strong young man at the construction site was bragging that he could out do anyone in a feat of strength. He made a special case of making fun of one of the older workmen. After several minutes, the older worker had had enough.

“Why don’t you put your money where your mouth is,” he said.
“I will bet a week’s wages that I can haul something in a wheelbarrow over to that outbuilding that you won’t be able to wheel back.”
“You’re on, old man,” the braggart replied. “Let’s see what you got.”
The old man reached out and grabbed the wheelbarrow by the handles.

Then, nodding to the young man, he said, “All right, get in.”

Too many cooks
A wife is scrambling eggs when her husband bursts into the kitchen.
"Careful," he cries. "Careful! You’re cooking too many at once. Too many! Scramble them! Now! We need more butter. They’re going to stick! Careful! Now scramble them again! Hurry up! Are you crazy? Don’t forget to salt them. You know you always forget to salt them. Use the salt. Use the salt! The salt!"
The wife turns and asks, "What is wrong with you?" Her husband calmly replies, "I wanted to show you what it feels like when I’m driving."


Herbert Construction Is at it Again…

Each year the Concrete Foundations Association of North America hosts a competition to highlight the most challenging and technical projects completed throughout the country. Herbert Construction has won awards in this national competition for the last 6 years in a row.

For 2017, it is no surprise that we have submitted two more projects into this contest for “Project of the Year”.

Bildon Construction and Development
The first project we entered was a very large basement and multiple retaining walls for Rick Fierer at Bildon Construction and Development.
This project was so large that the bidding process took almost two years to finalize due to the complexity and plan changes that needed to be made. There were drastic elevation changes (50’ change from the street to the first floor) that required 11 different footing sizes. In addition, there were multiple radius walls in the project totaling 773 vertical feet of angled corners.



t-Olive Properties
Our second entry was very technical and consisted of 6 phases of construction for Brian and Randy Schiltz of t-Olive Properties. There were several things going on with this project, including concrete walls for a pool house with a slab on grade, a garage addition to the existing house and a stairway wall.  The most interesting part of this project is the elevated concrete structural slab that we constructed. This concrete slab is suspended above the garage to provide a lanai and open deck space as part of the renovation.  To add to the complexity of this project, the site was located in Midtown Atlanta and the property lines were so close that it was difficult to access the job using traditional equipment.


We love doing projects like these and would like to thank Rick Fierer, Brain Schiltz and Randy Schiltz for trusting our expertise and including us on these challenging projects.


We are Hiring

Herbert Construction is growing! We are currently hiring for the following positions:

Construction Estimator
CAD and Estimating
experience is preferred.

Boom Truck Operator
Class B CDL Required

If you know someone that would fit either of these positions, please have them contact Ashley Hollifield

AshleyH@HerbertConstruction.com



Life Hacks

Everyone could use a few shortcuts in life. Just making some things a bit easier could make a big difference. Here are a few life hacks that are sure to bring a smile.




Message from Doug...

Positive Reports Signal an Improved Economy

Americans’ confidence in the economy soared in November. That is good for us in the construction industry in Atlanta, as well as the entire nation as a whole. That will show itself in strong holiday spending as well as growth next year.

The Conference Board’s monthly index of consumer confidence soared to 107.1 in November. This was the highest it has been since July 2007. Americans spend more when they are confident in the economy and its future.

The report also shows that Americans feel much better about the job market. Nearly 27% of respondents in the survey said jobs were “plentiful,” which is the most since August 2007. Historically, a high number like that has pointed to solid job growth ahead.

Trump’s Lofty GDP Goal
During President-elect Donald Trump’s campaign, he pledged to bring jobs back to America and increase overall economic growth. In a September speech, he said, “It’s time to establish a national goal of reaching 4 percent of economic growth.”

Over the last four decades, only Bill Clinton has come close to a 4% GDP rate, averaging 3.9% while he was in office. President Obama has averaged only 1.5% GDP.

While some economists believe 4% would be a tall order, many have improved their GDP forecasts based on Trump’s proposals to cut taxes and increase spending on infrastructure. They believe a GDP rate of 2.5% may be more likely in 2017 and 2018.


U.S. Presidents’ GDP Annual Average

Jimmy Carter (1977-1980), 3.3%
Ronald Reagan (1981-1988), 3.5%
George H.W. Bush (1989-1992), 2.3%
Bill Clinton (1993-2000), 3.9%
George W. Bush (2001-2008), 2.1%
Barack Obama (2009-2016), 1.5%
Source: Marietta Daily Journal


U.S. Home Prices Improve
The Standard & Poor’s CoreLogic Case-Shiller national home price index is slightly above the peak it set in July 2006. That high point comes after four years of steady gains.

David Blitzer, managing director at S&P Dow Jones Indices said, “The new peak set by the S&P Case-Shiller CoreLogic national index will be seen as marking a shift from the housing recovery to the hoped-for start of a new advance.”

The ongoing recovery in home prices will increase Americans’ household wealth and grow the equity in their homes. This should provide an incentive for homeowners to consider selling their home and moving into another one.

In spite of the recent S&P report, other sources say there are still challenges in housing markets around the county. In many cities, home prices have not fully recovered and remain below their peaks. The quick rise in home prices has created an affordability issue in many markets as prices have outpaced household incomes.

According to S&P, home prices have increased at a 5.9% annual rate, adjusted for inflation. During that same time, Americans’ after-tax incomes have increased just 1.3%.

In spite of some housing challenges around the country, many Americans are optimistic about the upcoming year. They expect to see improvements in their income and household wealth. I hope you receive both of those in the coming year.

To Your Success,


Recent Referrals - Thank You!

Christmas is almost here and the hustle and bustle of the holiday season is in full force everywhere you look. Lights, family, gift-giving and good food abound this time of year and that is what makes it truly magical. Here at Herbert Construction we are very thankful to our customers and associates who continue to refer our company to others. You guys are AWESOME!

Shane Spencer, MJC Southside, Inc. – Masonry Contractor  www.MJCSouthsideInc.com

Darrell Sheets, The Erosion Company – Erosion Specialist  www.TECompanies.com

Bob Hupp, Traton Homes – Homebuilder  www.TratonHomes.com


Herbert Const. Co. Wins National Project of the Year Award

Glenn Gilbert (right) of Outsource Const. receives a 
Project of the Year Award from Doug Herbert.

Earlier this year we completed a commercial project for Glenn Gilbert of Outsource Construction. The project consists of two buildings that will house trendy restaurants and retail stores near the popular area of Howell Mill Rd. at I-75.

The project was so unique and interesting that we entered it into the Project of the Year competition held by the Concrete Foundations Association (CFA). For this competition, the best concrete contractors throughout North America submit their most challenging projects to vie for the prestigious award.

The entries are viewed and voted on at the World of Concrete convention in Las Vegas. More than 60,000 attendees from around the world attended this year’s convention.

And the Award Goes to…
We are pleased to announce that our project won the Project of the Year Award in the Commercial/Multi-Family category. This is our sixth year in a row to win a Project of the Year Award from the CFA.

The focal point of the restaurant/shopping area is this highly technical 
architectural concrete wall, which was constructed by 
Herbert Const. Co. and winner of a national Project of the Year Award.

For Glenn Gilbert of Outsource Construction, the project spanned nearly two years from inception to its current state. Glenn is building out the interior of Building 1 for a restaurant and professional offices. He is also beginning the shell of Building 2 now that the tenant profile has been firmed up.

Glenn has enjoyed seeing this project come to life and has been very satisfied with the outcome. Recently, we were able to speak with Glenn about his progress and marvel at the finishing touches being made since we completed the concrete work.

We presented Glenn with an award plaque as a way to say thank you for including us in this complex endeavor. We also imprinted a cake with an image of the concrete wall that we constructed as a fun way to celebrate the Award.

This project was smaller in nature than almost all of our other projects that we have submitted for the Project of the Year Award. However, what it lacked in size it more than made up for in its complexity.

Architectural Concrete Walls
The first building required highly technical work to create an architectural concrete wall that would serve as the focal point for the whole project.  What made this wall so special was that a large 12’-2 1/2” radius opening was created in the 18’-6” tall concrete wall. Patrons will walk through that concrete arch to enter the restaurant on the ground floor.

The architect and owner were very specific regarding the look they wanted to achieve for the architectural concrete wall. So, we decided that a different forming technique with specialized materials would achieve the aesthetic look.

We used a special forming system to attain the 
architectural concrete finish on the wall.

We chose an MDO plywood forming system to construct the wall. The large form for each section was built on the ground and tilted up into place using our boom truck. The form tie hole pattern was selected to provide a clean and uniform appearance. Also, to achieve the smooth finish requested by the architect and builder, a 4500 psi small aggregate concrete mix was used.

Our wall crews are accustomed to using our aluminum wall forms on a daily basis, so the plywood forming segment of this project required the assistance of Barry Herbert, CEO, who has extensive experience using this particular forming system. In addition, Mike Herbert, our Vice President of Construction, was called upon to supervise this unique project.

Tight Site Conditions
The second building that we constructed involved concrete footings and walls that would create a terrace level foundation. This building was squeezed into a very tight location, which required shoring of the existing soil to allow for a safe working area for our guys. 

The main level floor is concrete on metal decking, supported by steel I-beams. To accomplish this, 168’ of continuous angle iron was cast in place in the top of the 12’-0” tall wall. Eighteen beam plates were embedded in the face of the wall, and 80 anchor bolts were placed in the top of the wall for steel columns.

In addition to the structural steel considerations, a metal door frame and three window openings were placed in the wall.

The concrete walls had rebar reinforcing horizontally and vertically, on both faces. Vertical contraction joints in the wall with water stop added to the complexity of the project.

A Special Concrete Contractor
To celebrate the award, we gave Glenn Gilbert a cake that 
had an edible image of the project applied to the top of it.

When we spoke with Glenn Gilbert regarding the completion of this project he explained that he has never had to work with a poured wall contractor before. He stated, “I needed a special company, someone who had the knowledge to complete this type of concrete work to the specifications that were set. I was referred to you guys and I was impressed with your ability to accommodate our plans.”

There are very few concrete contractors in Metro Atlanta that can construct architectural concrete walls that match the design qualities that architects require.

“I consulted with Herbert Construction through several variations of this project. Once the development was released for construction, I knew that they were the ideal concrete contractor for this project,” Glenn said.

During our recent walk-through of the buildings, it was really nice to see how the architect, Andrew Robertson of ASD/SKY, designed them to fit in so well with the community in which they were built. Unique features include open Amphitheatre seating, stacked rock benches and exposed brick work inside the restaurant. We are proud to be a part of this project.

Thank you, Glenn, for involving us in this project. We hope to work with you on many more projects.